Now partnering with founders and teams shipping with Guided AI. Let's Talk →
All posts

What happens… if we leave

Starting a new software project often means planning the transfer of responsibilities and ownership in the long term.

There’s a question that rarely comes up while a project is being scoped and comes up constantly once it’s running: what happens when you’re gone?

It’s an uncomfortable question to ask a vendor and an uncomfortable one to answer, which is probably why it gets deferred until it’s urgent. But the answer shapes more about how a project should be run than most of the decisions that do get made up front.

In practice, engagements end in one of three ways. They’re different enough that it’s worth naming them separately, and similar enough in what they demand that the distinction matters less than people expect.

End #1: Build it, then hand it over

The client wants an initial build and intends to take the code on for future phases. Often they have a small internal team already, or they’re hiring one, and the first version needs to exist before that team can be justified.

This is the easiest case, because the handover has a target date. Everyone knew it was coming from the beginning. 

It’s also where the most predictable failure happens: treating documentation as an end-of-project deliverable. Someone budgets two weeks (probably too late and not enough time)  at the close of the engagement for “knowledge transfer,” and those two weeks produce a document describing what the system does. Which the receiving team could have determined by reading the code.

What they can’t determine by reading the code is why it isn’t something else. The approach that was tried and abandoned. The business rule that made the obvious design wrong. The thing that looks like an oversight and is actually a deliberate decision someone will otherwise “fix” in month three.

That part has to be captured while it’s happening, because by the close of the project nobody remembers it either.

End #2: Embedded In The Team

Here there’s no handover date at all. Senior engineers work as part of the client’s team, often for a long time, and the relationship doesn’t have a scheduled end.

This looks like the lowest-risk partnership and is quietly the highest. When people work together daily, knowledge moves constantly and informally – there’s a big team with a lot of knowledge and none of it is written down.

Then the engagement ends, or a person rotates off, or the client’s own lead moves on. The shared understanding that made the arrangement work turns out to have been held in conversation, and conversation doesn’t survive the people having it.

The discipline required here is the least natural of the three, because nothing in the day-to-day creates pressure for it. Everything is working. That’s precisely the situation under which records don’t get written.

End #3: The Takeover Option

This is the most common, and the most interesting.

The client isn’t planning to take the code in-house. They may never. What they want is to know that they could even when they don’t want to. The option is there.

That’s an option in the financial sense. It has value whether or not it’s ever exercised, and like any option it’s only worth something if it can actually be executed.

An option you’d need six months and an archaeology project to exercise isn’t an option. It’s a hope. The client believes (and feels like) they can leave; they haven’t tested it; and the test happens at the worst possible moment, because the moments that trigger it are never calm ones. A new technical hire arrives with opinions. An acquirer starts asking questions. Something breaks that nobody can explain.

Which means the work of keeping the option real has to happen continuously, during a period when nobody is asking for it and there’s no visible reason to bother.

What All 3 Have In Common

The three endings all make the same demand.

The problem starts when a new team begins working without visibility into history. The decisions made with valid reasoning behind it or a path not taken gets undone. 

AI development speeds up the volume of that decision making during initial development. Many more decisions are made quickly without conversations and create little to no history. Things end up in the production code and fewer people (if any) know how they ended up there. 

Creating The History

Asking during a project, before any of the “ends” happens, what exists to document where notes, decisions and requirements are recorded.  The process should require the “why” and “what” from a change. The development partner can’t be the only team that understands the system. 

The cheapest form of lock-in is a system nobody else can explain. 


Ten24 Group builds software our clients can take over – whether or not they do. Start a conversation.

Have something you want built?

A 20-minute call to understand your idea, who'll pay for it, and the right way to build it.